Skip to content

Schilling Vigilance · Free checklist

PV Market Entry Checklist

What has to be in place, from a pharmacovigilance point of view, before and after a product launches in a new country. One PDF per region: a four-phase checklist and a country overview of local PV person, serious ICSR deadline, periodic reports, RMP and PSMF, drawn from the PV Country Knowledge database.

What is inside

  1. Phase 1 · Before you file

    Local PV organisation: local MAH or representative, responsible person, residency, qualification, deputy, 24/7 availability.

  2. Phase 2 · With the application

    Authority notification, PV system registration, PSMF and RMP requirements.

  3. Phase 3 · Before launch

    ICSR reporting route, electronic gateway prerequisites, format, language, national literature, local SOPs and training.

  4. Phase 4 · From launch

    Serious and non-serious ICSR deadlines, periodic reports, signals, literature monitoring, retention and inspections.

Draft research, not legal advice. The country findings come from AI-assisted research that is still being reviewed. Check the source of each finding in the database before relying on it.

Get the checklist

Free with a subscription to the Schilling Vigilance newsletter. You confirm by email, then download the PDFs.

Sent with Brevo (EU). You confirm by email before anything is sent. Details in the privacy policy, section 9.